Products
PRODUCTS DETAILS
Home > Products >
EV Charging ECO Gamma Frame Carport Universal Mount Solar Parking Canopy Smart Electric Vehicle Station

EV Charging ECO Gamma Frame Carport Universal Mount Solar Parking Canopy Smart Electric Vehicle Station

MOQ: 1 Set
Price: 0.16~0.20 USD/W
Standard Packaging: Protector-Capped Charger Components + Pre-Installed Cable Management in Export Crates
Delivery Period: 15-20 Working Days
Payment Method: T/T, L/C
Supply Capacity: 500MW per Year
Detail Information
Place of Origin
China
Brand Name
HzRack
Certification
ISO 9001:2015, IEC 61851 Compatible
Model Number
ECO-G-EV22
Highlight:

EV Charging Integrated Solar Carport

,

Universal Mount Charging Canopy

,

Smart Electric Vehicle PV Station

Product Description
EV Charging ECO Gamma Frame Carport Universal Mount Solar Parking Canopy Smart Electric Vehicle Station
The EV Charging Integrated ECO Γ Frame Carport represents the convergence of solar energy generation and electric vehicle charging infrastructure in a single, purpose-engineered structural system. Designed for the rapidly expanding electric mobility market, this gamma-shaped (Γ) carport integrates dedicated EV charger mounting provisions, cable management pathways, and electrical infrastructure routing channels directly into the structural frame. The result is a turnkey solar carport solution that transforms parking spaces into clean energy generation and vehicle charging stations without the aesthetic and functional compromises of retrofitting charging equipment onto conventional structures.
The integration philosophy begins with the dual C-purlin design, where the cavity between the two cold-formed steel sections creates a protected routing channel for power cables, communication wiring, and charger supply circuits. This cavity runs the full length of each structural bay, allowing chargers to be positioned at any column or intermediate location without external conduit runs. Each column incorporates a universal charger mounting plate factory-welded at a standardized height, compatible with major EV charger brands including Tesla, ChargePoint, ABB, and Schneider Electric.
Key Features
  • Integrated Charger Mounting System: Factory-welded universal mounting plates at every column accept all major EV charger brands with pre-installed grounding and 30-minute installation time
  • Concealed Cable Routing Channels: Dual C-purlin cavity serves as protected power and data cable pathway along the full structural bay length, eliminating external conduit
  • Smart Charging Ready Infrastructure: Dedicated low-voltage pathways for data, control, and communication cabling support load management systems
  • Integrated Cable Management: Built-in retraction systems at each charging position keep cables organized and elevated
  • Solar-Direct Charging Capability: Structural design accommodates DC-coupled charging configurations where solar PV output directly supplies EV chargers
  • Fleet Depot Configuration Option: Centralized power distribution cabinets integrated into the structural footprint for commercial fleet applications
  • Future-Proof Electrical Pathways: Oversized cable routing channels with 40% spare capacity accommodate future charging technology upgrades
Technical Specifications
Parameter Specification
Charger Compatibility Universal Mount (Tesla, ChargePoint, ABB, Schneider +)
Charger Installation Time <30 Minutes per Unit (Excluding Electrical Connection)
Cable Routing Capacity Dual C-Purlin Cavity, 40% Spare Capacity
Max Chargers per Bay 4 Units (2 per Column Row)
Power Distribution AC Level 2 (7-22kW) and DC Fast Charge (50-350kW) Ready
Structural Material Q235B Cold-Formed Steel
Surface Treatment Hot-Dip Galvanized 85μm
Wind Resistance Up to 50 m/s
Snow Load Up to 1.8 kN/m²
Foundation Reinforced Concrete with Integrated Conduit
Warranty 12 Years Structural, 5 Years Electrical Provisions
Service Life 25+ Years
Applications
This EV-ready system is purpose-built for the intersection of solar energy and electric mobility infrastructure. Primary applications include:
  • Corporate and tech company campus parking where employee EV adoption is rapidly increasing
  • Shopping center and retail destination parking where customer EV charging attracts higher-spending demographics
  • Highway service plazas and rest areas requiring combined solar canopy and fast-charging infrastructure
  • Municipal and government fleet depots transitioning to electric vehicles
  • Multi-family residential developments where dedicated EV charging in covered parking is increasingly a market differentiator
Packaging & Quality Assurance
Charger mounting components are individually packaged with protective caps on all electrical connection points and supplied with mounting templates and torque specifications. Each shipment includes a complete electrical integration guide with conduit routing diagrams, grounding schematics, and coordination recommendations. Factory quality control includes dimensional verification of all mounting plate positions using CNC measurement, pull-testing of cable retraction mechanisms, and continuity testing of pre-installed grounding connections.
Factory Strength
Our 25,000-square-meter manufacturing facility operates under ISO 9001:2015 and maintains partnerships with major EV charger manufacturers for technical coordination and compatibility testing. With 500MW annual production capacity and growing experience in integrated solar EV infrastructure projects across multiple continents, we provide coordinated submittal packages including structural drawings, electrical integration details, and charger mounting specifications in a single project delivery document.
Frequently Asked Questions
Which EV charger brands are compatible with the integrated mounting system?
The universal mounting plate accommodates all major brands including Tesla Wall Connector, ChargePoint CT4000/CPF50, ABB Terra series, Schneider EVlink, Delta, Siemens, and Wallbox. If your preferred charger is not listed, we can fabricate custom adapter plates with a 2-week lead time at no additional tooling cost.
Can I add EV chargers to the system after initial installation?
Yes, the integrated cable routing channels and pre-installed mounting plates make retrofitting additional chargers straightforward. We recommend installing the maximum anticipated number of conduit runs during initial construction, even if chargers are deferred, as this minimizes future civil works.
How is the electrical safety managed with metal structure and EV charging?
The system includes comprehensive grounding provisions with dedicated grounding conductors bonded to every structural module. All mounting plates have factory-installed grounding studs, and the galvanized coating provides a continuous conductive path to the earth grounding system as verified by continuity testing during quality control.